Griddles
Closed Combined synopsis/solicitation (open for bids)
This opportunity is closed. It is kept here for reference. Similar opportunities that are open now are listed below.
Response deadline: Fri, May 1, 2026, 1:00 PM EDT (source lists UTC-05:00)
About this opportunity
Heavy duty gas griddle, stainless steel front, sides and front top ledge. Fully welded stainless and aluminized steel body frame. 11 Inch low profile cooking height on 6 Inch legs.1 Inch thick polished steel griddle plate with 12-gauge, 4 Inch stainless steel back and tapered side splashes. 72 Inch W 31-1/2 Inch D 15-1/4 Inch H 6 Burners, 162,000BTU, 2 Drawers ? Fully welded stainless and aluminized steel chassis frame ? 11 Inch low profile cooking height on 4 Inch adjustable legs ? 1 Inch thick polished steel griddle plate with 12 gage, 10 Inch stainless steel back and tapered side splashes ? Spatula wide 3-1/2 Inch grease gutter and chute are fully welded for easier cleaning and to stop grease migration ? One 27,000 BTU/hr. U shaped aluminized steel burner for every 12 Inch of griddle width ? One embedded snap action thermostat per burner with temperature adjust from 200 Degree F to 550 Degree F on Steel or Chrome plate; temperature adjusts from200 Degree F to 450 Degree F on Rapid Recovery plate ? Large 6-quart stainless steel grease drawer (2 drawers on 60 Inch and 72 Inch models) ? Heavy duty chromed thermostat knob guards ? One pilot safety valve for every two burners; safety will completely shut off gas to pilot and burners if pilot extinguishes ? Manual ignition ? Bottom heat shields ? ? Inch rear gas connection and gas pressure regulator supplied with the unit must be installed ? Natural Gas 4.0 Inch 3/4 rear gas connection. 4 each: HOSE ? Inch x 4Ft long gas flex hose, and quick disconnect 4 each: Equipment Stand (STAND/C-72SA72)Universal equipment stand 24 Inch H, 1/2 Inch marine edge, undershelf, stainless steel, 5Inch casters 3 each: BANKING STRIP Griddle Banking Strips ? Deliver equipment with4eachall power and water lines for installation to existing supply lines. ? Unpack and install/connect/assemble new equipment and water filter system to existing supply lines and remove/discard all rubbish with installer. ? Once installed/connected, test equipment is fully operational in the presence of POC prior to departing the facility Standard Parts and Warranty
How to respond
Responses are submitted to the government, not through WhatGovBuys. Read the full notice and every attachment on SAM.gov, including amendments, before you prepare an offer. You need an active SAM.gov registration to receive a federal award.
Open opportunities like this one
61--Motor,alternating Curr
- Status
- Open for bids
- Agency
- Defense Logistics Agency
- Deadline
- Responses due Nov 30, 2026 (1 day left)
59--Insulating Compound,el
- Status
- Open for bids
- Agency
- Defense Logistics Agency
- Deadline
- Responses due Nov 30, 2026 (1 day left)
61--Cable Assembly,special
- Status
- Open for bids
- Agency
- Defense Logistics Agency
- Deadline
- Responses due Nov 30, 2026 (1 day left)
- Set-aside
- Small Business Set Aside - Total
61--Adapter,power Supply
- Status
- Open for bids
- Agency
- Defense Logistics Agency
- Deadline
- Responses due Nov 30, 2026 (1 day left)
59--Solenoid,electrical
- Status
- Open for bids
- Agency
- Defense Logistics Agency
- Deadline
- Responses due Nov 30, 2026 (1 day left)
- Set-aside
- Small Business Set Aside - Total